Obligationserbjudanden / Liepojos kopos

Liepojos kopos

Liepāja's 1902 Bath House by the beach becomes a 125-room hotel and spa. Up to 10% a year.

HotellLitauenSäkerställdNasdaq Vilnius
Senaste videon

Liepojos kopos 9.5–10% bonds: Liepāja's 1902 Bath House becomes a hotel & spa

Alla videor ↗

Investeringssammanfattning

Uppdaterad 28 nov.

Funding for a 125-room hotel and SPA in Liepāja's historic seaside Bath House, owned by two co-owners of the Freda furniture group. Labelled secured, but the hotel itself is mortgaged to ALTUM, and the bond money ranks behind ALTUM, more like equity.

Styrkor

  • Strong, wealthy sponsors with a long business record (Freda)
  • Unique protected landmark site in a sought-after seaside location
  • ALTUM state co-financing (35% of budget) and a fixed-price general contractor (€27.1m)
  • Shareholders committed to cover construction cost overruns
  • Investor put at 102% on change of control or delisting

Risker

  • Bondholders are effectively behind ALTUM: no claim on the building itself
  • Early stage: €0.9m of €27.1m construction done by 30 Sep 2026; opening only in Q4 2028
  • ALTUM loans not yet disbursed; drawdown conditions still pending
  • Repayment in Dec 2029 needs refinancing just a year after opening
  • Hotel and SPA demand in Liepāja is seasonal and unproven for this size

Vem du lånar ut till

UAB Liepojos kopos (Lithuania) owns 100% of SIA Liepojos kopos (Latvia), which is restoring the 1902 Liepāja Bath House 280 m from the beach and adding a new 4-storey hotel (125 rooms, SPA, pools, conference). Owners: Rimas Varanauskas 75% and Virginijus Brundza 25%, long-time shareholders of Freda (Baltic furniture group, ~€300m revenue). Planned operator: Ego SPA. Completion expected Q4 2028.

Hur du får tillbaka pengarna

The bonds mature on 9 December 2029, about a year after the planned opening. The plan is to refinance with a bank once the hotel is stabilised (banks indicated LTV ≤ 50%, net debt/EBITDA ≤ 8x) or to sell the project company or the property. Until ALTUM is repaid, the project company may not pay anything up to the bond issuer.

Vad som skyddar dig

Pledge of 100% of the project company's shares and of a dedicated account. The real estate, land and equipment are mortgaged first to ALTUM (loans €13.3m, of which €5.3m can be forgiven). The document itself says the bond funding is subordinated and in substance equivalent to equity.

Nyckeltal

Coupon
9.5% or 10%, quarterly
Size
€4m (programme up to €8m)
Maturity
9 Dec 2029
Total project cost
€38.5m
ALTUM senior loans
€13.3m
Shareholder loans so far
€3.6m
Call
101% from Dec 2027, then 100.5%, 100%
Market
First North (Vilnius)

Skrivet utifrån de officiella dokumenten: Information Document (16 Nov 2026); Draft Final Terms (16 Nov 2026). En sammanfattning, inte råd. Läs originalen innan du bestämmer dig.

Vad skulle jag tjäna?

Du sätter in 1 000 €. Liepojos kopos betalar dig 95 € per år i ränta.